Highways and Bridges Other Projects
Several Road Works in the North Eastern Region of Syria
in progress
Aleppo – Sarakeb Highway
1992-94
Damascus International Airport taxiways & asphalt shoulders
1992-93
Rehabilitation of several roads project
1989-93
The Rehabilitation of the Maaloula – Homs Highway
1980-82
Footbridge
1997
Abrash River Bridge
1976-78
Highway Approaches to the Rastan Bridge
1976- 77
The Rehabilitation of the Rastan – Sarakeb Highway
1975-78
Bridge at Rastan
Damascus – Homs Highway
1970-74
Damascus – Mezzeh Airport Highway
1967
Damascus – Damascus International Airport highway
1966-69
Client:
Ministry of Communications.
P&LY Works:
all rehabilitation works
Back to Top
all rehabilitation works.
Directorate of Civil Aviation.
all rehabilitation of taxiways and shoulders works.
The laying of three layers of bituminous concrete on a 100 Km existing highway.
The Maaloula – Homs Highway
Located in Damascus, the prestressed precast beams are 21 meters wide with a cast place pile foundation. The bridge was completed in three months.
Municipality of Damascus.
All works
This prestressed concrete bridge on the Abrash river in the Tartous area has a 35-meter span with precast concrete piling.
Ministry of Communication.
All Works.
A 5 Km long double lane dual highway with a cloverleaf.
A view of the Rastan Highway
The laying of two layers of bituminous concrete on a 90 Km existing highway.
This prestressed concrete overflight crossing has a span of 36 meters.
A 160 Km long highway with bridges, culverts and cloverleaves.
A dual double way highway completed in five months.
A dual doubleway highway with over flight crossings in prestressed precast beams.